Gatwick Airport North Terminal Airside
Completed March 2020 this project was carried out by a Gatwick approved contractor, in December Latitude 45 Ltd was asked to become involved with the project to provide the joinery and decretive metal work items.
With a very short fabrication time before handover we flew into action and with a few weeks had the project fully detailed and in manufacture using our trusted and ever reliable team.
Being the first site for Pure in the airports there were a number of challenges based around allowable materials and construction methods these were all quickly overcome and turned into practicality.
What was a supply only contract turned into a supply and install which again had its own challenges, with our experience having being involved with Pure since 2012 these challenges where overcome and finished article is simply stunning – with onset of Covid 19 the opening was been delayed.
Project Manager – Latitude 45 Ltd (Rodger Hitchcock)
Site Manager – Latitude 45 Ltd (Tim Hitchcock)
Installation – Latitude 45 Ltd (Artur Stolarz)
Metalwork Fabrication – F1 Manufacturing
Corian – Seamless Fabrications
Joinery – SRS Joinery