Completed March 2020 this project was carried out by a Gatwick approved contractor, in December Latitude 45 Ltd was asked to become involved with the project to provide the joinery and decretive metal work items.

With a very short fabrication time before handover we flew into action and with a few weeks had the project fully detailed and in manufacture using our trusted and ever reliable team.

Being the first site for Pure in the airports there were a number of challenges based around allowable materials and construction methods these were all quickly overcome and turned into practicality.

What was a supply only contract turned into a supply and install which again had its own challenges, with our experience having being involved with Pure since 2012 these challenges where overcome and finished article is simply stunning – with onset of Covid 19 the opening was been delayed.

Project Manager – Latitude 45 Ltd (Rodger Hitchcock)

Site Manager – Latitude 45 Ltd (Tim Hitchcock)

Installation – Latitude 45 Ltd (Artur Stolarz)

Metalwork Fabrication – F1 Manufacturing

Corian – Seamless Fabrications

Joinery – SRS Joinery 

bottom of page