Your Design - Our Creation
Pure.
151 Shaftesbury Avenue
Pure Shaftesbury Ave- The original Pure built in 2012 was up for refurbishment and completed in September 2019.
​
The Shopfront and signage have both been replaced to make the shop more appealing to costumers and brighter.
The cold room and office where both moved and the shop floor area was almost doubled due to this. With the kitchen already in a fully operational. It was mostly a Front of house and Theatre Kitchen Refurb.
​
The Theatre Kitchen has been completely rebuilt and redesigned to allow the costumer to see the cooking and prep of there food.
​
In the front of house area, the floor was completely replaced to Amtico flooring. The counter and pass where adapted and re-cladded to latest pure design with stripy panels, blackened steel and Corian.
​